Pipeline / quote q_17f19dc73f63
L. Ortega: 7.33 kW solar and 1 battery
$35,223
installed price (lease)
$35,223
after credits you claim
$3,921
year-one bill savings
—
simple payback
95%
of 12,349 kWh a year
Incentives applied
| Incentive | Value | Who claims | Checked |
|---|---|---|---|
| California Net Billing Tariff (exports credited at avoided-cost rates) Exports earn avoided-cost credits far below retail, so a battery that stores midday solar for the evening is worth more than exporting. The quote values exports with the utility's export rate table. | — | utility bill | source, verified 2026-11-06 |
Listed, not priced
| Federal Residential Clean Energy Credit (25D), 30% | only for cash or loan ownership | source | |
| Federal Clean Electricity Investment Credit (48E) for leased and PPA systems | not verified by a reviewer yet: not used in the price | source | |
| SGIP Equity Resiliency battery incentive | not verified by a reviewer yet: not used in the price | source | |
| SGIP General Market battery incentive | not verified by a reviewer yet: not used in the price | source | |
| California property tax new-construction exclusion for active solar (R&T Code s.73) | system must be in service by 2026-12-31 | source | |
Only incentives a named reviewer has verified against their source, inside their dates, are priced (D21). Tax credits depend on your own tax situation: ask a tax adviser.
System
7.33 kW DC, 11.11 kW AC inverter capacity, 1 × 13.5 kWh battery.
Makes about 11,728 kWh a year: 9,461 used at home, 2,267 exported at the net-billing rate.
⚠ The 200 A panel allows 40 A of backfeed and this system needs 57.9 A (NEC 705.12, battery inverter counted). Priced options:
- derate the main breaker to 180 A if the home's load calculation allows
- a supply-side (line-side) connection, where the utility and inspector allow it
- a main panel upgrade (busbar 225 A or more)
Monitoring: a SunLoop gateway reads the inverter and the grid, and this quote's production becomes the promise your installer is measured against.
Disclosures
California Solar Energy System Disclosure Document and the CSLB Solar Energy System guide are given before signing. Contractor licence C-46 000000 (SYNTHETIC). Quote prepared 2026-11-06; expected in service 2027-02-04. Wording reviewed by a lawyer before Launch (R10).